tracking_system:calibration
This is an old revision of the document!
Calibration Procedure
- Find the ART case
* Remove the metal rods and L shaped alignment tool.
- Assemble the two metal rods to create a single T-shaped alignment wand.
* Position the L shaped alignment tool in the center of the CAVE floor. The bottom left point on the L will be the position of the origin (0, 0, 0).
- From the rendernode, use the UltaVNC viewer to connect to the head node. We want to see Dtrack2 from within the CAVE to help with calbiration.
- If Dtrack2 is currently measuring, then use the menu to stop measurement.
- From Dtrack2's menu select: Calibration > Room
- The settings that you want is 410mm wand length, and the coordinate system should say “Power wall”.
- Then click the button labeled Calibrate.
- Here is a video demonstration of how to wave the calibration wand within the CAVE.
tracking_system/calibration.1568406928.txt.gz · Last modified: by apenngrace
