User Tools

Site Tools


tracking_system:calibration

Calibration Procedure

Find the ART case

Remove the metal rods and L shaped alignment tool.

Assemble the two metal rods to create a single T-shaped alignment wand.

Position the L shaped alignment tool in the center of the CAVE floor. The bottom left point on the L will be the position of the origin (0, 0, 0).

From the rendernode, use the UltaVNC viewer to connect to the head node. We want to see Dtrack2 from within the CAVE to help with calbiration.

If Dtrack2 is currently measuring, then use the menu to stop measurement.

From Dtrack2's menu select: Calibration > Room

The settings that you want is 410mm wand length, and the coordinate system should say “Power wall”.

Then click the button labeled Calibrate.

Here is a video demonstration of how to wave the calibration wand within the CAVE.

tracking_system/calibration.txt · Last modified: by apenngrace

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki