====== Calibration Procedure ====== Find the ART case {{:tracking_system:img_5818.jpg?300|}} Remove the metal rods and L shaped alignment tool. {{:tracking_system:img_5819.jpg?300|}} Assemble the two metal rods to create a single T-shaped alignment wand. {{:tracking_system:img_5823.jpg?300|}} Position the L shaped alignment tool in the center of the CAVE floor. The bottom left point on the L will be the position of the origin (0, 0, 0). {{:tracking_system:img_5822.jpg?300|}} From the rendernode, use the UltaVNC viewer to connect to the head node. We want to see Dtrack2 from within the CAVE to help with calbiration. {{:tracking_system:screenshot_2019-04-02_14.02.50.png?300|}} If Dtrack2 is currently measuring, then use the menu to stop measurement. From Dtrack2's menu select: **Calibration > Room** {{:tracking_system:screenshot_2019-04-02_14.11.36.png?300|}} The settings that you want is 410mm wand length, and the coordinate system should say "Power wall". {{:tracking_system:screenshot_2019-04-02_14.13.33.png?300|}} Then click the button labeled **Calibrate**. Here is a video demonstration of how to wave the calibration wand within the CAVE. {{ :tracking_system:img_5802.mp4 |}}